Control NDE & PWHT Before They Delay Hydro.

Metrix keeps weld tracking, NDE, heat treatment, and hydro readiness connected in one structured QA system — so nothing slips through the cracks.

Where Contractor QA Breaks Down

NDE percentages, welder shots, and PWHT requirements are often defined at the line level — but tracked manually across spreadsheets, emails, and disconnected weld logs. As weld counts grow, required inspections get missed and hydro gets scheduled without full confirmation.

What That Creates on the Job

Metrix Brings Control Back to the Field

Metrix connects systems, lines, drawings, and welds into one structured workflow. NDE and PWHT requirements are enforced automatically, visibility is real-time, and hydro packages build from verified data — not rebuilt spreadsheets.