Control NDE & PWHT Before They Delay Hydro.
Metrix keeps weld tracking, NDE, heat treatment, and hydro readiness connected in one structured QA system — so nothing slips through the cracks.
Where Contractor QA Breaks Down
NDE percentages, welder shots, and PWHT requirements are often defined at the line level — but tracked manually across spreadsheets, emails, and disconnected weld logs. As weld counts grow, required inspections get missed and hydro gets scheduled without full confirmation.
- Line-level NDE and PWHT tracked manually
- Percentage shots calculated outside the weld log
- Hydro scheduled without real-time confirmation
- No clear visibility into outstanding inspection requirements
What That Creates on the Job
- Hydro delays caused by missed NDE or PWHT
- Emergency inspection requests before pressure tests
- Rework due to missed percentage or thickness requirements
- Reactive QA instead of controlled enforcement
Metrix Brings Control Back to the Field
Metrix connects systems, lines, drawings, and welds into one structured workflow. NDE and PWHT requirements are enforced automatically, visibility is real-time, and hydro packages build from verified data — not rebuilt spreadsheets.